Lehvoss Group: Expansion of the compounding technical center

Another compounding plant for the development of high-performance compounds went into operation.

After extensive construction work in its innovation center, the Lehvoss Group has put another compounding plant into operation at its Hamburg location. The twin-screw extruder used was tailored to the requirements by the manufacturer Krauss Maffei Extrusion GmbH. For the development of innovative plastic compounds, recyclates, concentrates, additives and hotmelts, the high-temperature plant is equipped with various side extruders and dosing. A wide range of raw materials such as granulates, fibers, flakes, powder and liquids can be metered. Newly developed screws with a special design for an adapted and optimized melt preparation are also used.
“I’m proud to now have such a future-proof system with the latest technology in our technical center. This enables us to drive innovations even better and faster, and our customers receive samples and results in an even shorter time. The first customer projects and advance developments are already waiting to be implemented,” says Dr. Linda Trosse, Head of Process Engineering Development, Lehmann & Voss.

Tips for Writing Presentation Slides

g-protein-coupled receptor inhibitors

Not many school kids are comfortable when teachers ask them to prepare presentations. It’s such a daunting task that students just do whatever they can to avoid making them. Unfortunately, quite a number of adults still think writing a presentation as something too mentally taxing.

When it’s been hours since you fired up Microsoft PowerPoint and you find yourself staring and blanks, you need help. Here are the top 5 things you need to keep in mind when preparing any presentation

Tips for Writing Presentations

#1. Always have an introduction, main message, and conclusion

The basic element grouping for essays still applies to presentations. You can’t just jump into the main message without giving the audience any kind of context or background information. You’ll end up with too many interruptions and questions later on.

Use the first slide to introduce the outline of the things you’re about to cover. Be sure to put the conclusion at the end to sum up the major points and concepts that the audience should pick up.

Both the intro and conclusion should only take one slide. If you can’t put everything in a single slide, that’s alright. Some presentations are longer than others, so if you really have to, spread them into two slides.

#2. Put one idea per slide

As you move from one slide to the next, you’ll realize that putting only one idea per slide makes the transition from one slide to the next seems fluid. You are explaining your ideas one bit at a time and it is easier for the audience to grasp them. The audience knows that when you move to the next slide, you’re going to introduce the next concept or major point.

#3. Keep the text sparse and short

Although the basic elements of a presentation are similar to an essay, you should never plaster every slide with text. Writing a wall of text is one of the most common mistakes people make when making presentations.

Whenever possible, dedicate at most 25% of the available space for text. The more text you put on each slide will only make the presentation looks cluttered.

At the same time, be sure to use short sentences. Bullet points work very well for this because you don’t even need to write complete sentences.

#4. Focus on visuals

Since text only occupies a small portion of each slide, you can fill the rest with visual elements.

Visual elements are integral parts of a good presentation. Charts and graphs are excellent tools to simplify a long-winding explanation. It’s so much easier to understand complex data when you’re using images instead of words.

#5. Prepare a note

Since you’re keeping the slides nice and clean, you should prepare a note. It’s like a cheat sheet that you can peek once in a while as you’re explaining the main concepts you put on the slides. After all, not everyone is blessed with excellent an memory. If you need a note, make one.

OK, so those are our simple tips on writing presentations. Just remember that you should prepare the presentation way before you need to present them. Use the extra time to clear your mind so when it’s time to proofread and edit the slides, you can see them with fresh eyes.

If you need help with the proofreading, just copy all the text and paste it on the online spelling checker. It can save you plenty of time when trying to find spelling and grammar mistakes.

Qtm10-30 Small Business Mobile Concrete Blocks Making Machine in

Green tea bag packing machine

Product Description

1. QTM10-15 egg laying block machine: Large mobile brick machine Some other main features:

(a). the largest mobile machine in China; (b). can produce hollow and solid block; (c). with a HZC25 concrete mixing plant, block and concrete can be the two main products for your fortune;(d).with mobile concrete mixer you can take the production line to your construction pot or be a lessor for your customer.
2. QTM10-15 egg laying block machine: Advanced techniques made the host machine designed reasonably and
achieved box vibration, hydraulic stripping, omni-directional automatically movement.QMT10-15 egg laying block
machine works faster because of automatically feeding system. High quality of steel and precision welding made the
machine a longer service life and hydraulic system made less fault during work.
3. QTM10-15 egg laying block machine: This kind of brick machine is manufactured on the base of technical
modifications to the original block shaping machines, that is changing the former one-time-vibration into
twice-vibrations of molding core. This model of machine can be suitable to the customers who have any kinds of
existing cement working sites.
4. Hydraulic pressure
5. No need pallet

Overall Dimension

3250x2100x2350mm

Molding Cycle

20-25s

Moulding Size

1000X850

Machine Weight

4500KG

Total Power

19.3KW

Capacity

400*200*200mm hollow block : 1200-1440pcs per hour

Rated Pressure

10MPa

Product Advantages

Company Profile

QINGDAO HF MACHINERY CO.,LTD is the professional manufacturer and exporter for block machine technology. Our factory has three manufacturing bases that cover an area of 500 acresand a plant construction area of 100,000 square meters.

We are always developing advanced products to international standards to meet consumer demands. We cooperate with SIEMENS for Motors and PLC intelligent control system, YUKEN for the hydraulic operations to insure our machines have the highest quality standrads with a stable working status.

We have more than 50 technician to ensure superior installations and after sale service to assist customer to install the machine and perfrom the proper training abroad.

We warmly welcome clients from all over the world to visit our factory.

Our Customer

Why Choose Us

 

解決頂樓漏水問題的最佳方法與技巧

摘要

這篇文章探討了解決漏水問題的最佳方法與技巧,特別是在頂樓防水方面的重要性不容忽視。 歸納要點:

  • 使用綠色建材與循環經濟的防水材料,如植物性樹脂和再生橡膠,能有效延長防水層壽命並符合環保需求。
  • 智慧型防水系統透過感測器監控屋頂狀況,即時偵測漏水風險,實現預警及智慧化維護,減少損失。
  • 針對不同屋頂材質提供專業的防水方案評估,包括高科技自癒合塗料及高壓噴塗技術,提高防水效果。

總體而言,採用創新材料與技術可以有效提升頂樓的防水性能,保障居住安全。

頂樓漏水?先搞懂原因再修!

頂樓漏水真的讓人頭疼,首先我們得搞清楚原因。防水層的老化、外牆的裂縫,都是潛在的罪魁禍首!你有想過嗎?為什麼新建築也會出現漏水問題?這就跟選擇材料和施工技術息息相關。現在市面上有許多新型防水塗料,結合最新的施工技術,可以有效提升防水效能。例如,使用聚氨酯或丙烯酸類塗料,不僅附著力強,還具備良好的彈性。我們可以利用科技手段來偵測漏水,比如紅外線攝影或聲波儀器,這樣能準確找到漏水點,而不必盲目挖掘!所以,下次遇到漏水問題時,不妨先從這幾個方面入手檢查吧!

預算有限?聰明選擇頂樓防水重做方案

如果你的預算有限,但又想解決頂樓漏水的問題,聰明選擇防水重做方案就顯得格外重要。新型防水材料的出現,讓我們能夠以較低的成本來達到更好的效果,這樣不但可以有效防止漏水,更能降低未來可能需要的維修費用。那麼,有沒有想過利用舊屋翻新補助政策呢?透過這些政府資助,可以大幅減輕經濟壓力,讓修繕變得更加輕鬆。

找專業的防水工程團隊實在是不可或缺的一步。他們不僅能提供施工品質和安全保障,更能給你量身定製的解決方案。如果你還在猶豫,不妨多問幾家報價或了解他們的施工案例,相信會對你的選擇有所幫助!

我們在研究許多文章後,彙整重點如下

網路文章觀點與我們總結

  • 頂樓漏水是需要重做防水層的信號,常見的徵兆包括天花板上的水漬與水痕。
  • 屋頂破損、地面和牆面結構不佳以及排水系統問題都可能導致漏水。
  • 為了解決漏水問題,需要清除舊防水層,並更新相關設施如管線和衛浴設備。
  • 透過提前預防,可以減少因反覆修補而產生的費用,降低壁癌風險。
  • 社區內若有住戶提議進行防水工程,應共同討論選擇廠商及分攤費用。
  • 如果屋頂漏水情況嚴重,建議找專業師傅進行全面檢查與修繕。

在生活中,我們經常忽視家裡的小問題,但當發現屋頂開始漏水時,就該引起重視了。不僅是影響居住品質,更可能造成更大的經濟負擔。如果你周邊也有類似困擾,不妨主動尋求專業建議,共同解決這個棘手的問題,以免未來承受更多麻煩。

觀點延伸比較:

解決方案 優點 缺點 適合情況 重做防水層 提供長期保護,減少漏水風險 成本較高,需要專業施工 屋頂漏水嚴重,且老舊建築 修補現有防水層 相對經濟,快速解決問題 可能無法根本解決問題,需定期維護 初期小範圍漏水或小裂縫 檢查排水系統 可避免因阻塞引起的二次損害,提高排水效率 如果結構不佳仍需其他修繕措施 屋頂排水不暢通時 更新管線與衛浴設備 改善整體使用環境,有助延長設施壽命 需要時間和人力,影響日常使用 老舊設施需要更換時 社區合作進行防水工程 分擔費用,共同提高整體居住品質 協調困難,可能存在意見分歧 社區內多戶面臨類似問題

常見漏水問題:水泥龜裂與防水層老化

常見漏水問題中,水泥龜裂與防水層老化是最讓人頭疼的兩大因素。

Keyword: 室內設計

Tiger Infrastructure Partners acquires International Aerospace Coatings

Tiger Infrastructure Partners, a middle market growth infrastructure investor, has announced the acquisition of International Aerospace Coatings (“IAC”), a market-leading aviation services provider headquartered in Shannon, Ireland and Irvine, California.

IAC utilises 18 hangars strategically located at seven airports and two customer sites in the United States and Europe to provide essential services to a diverse and durable customer base in the global aviation industry, including aircraft manufacturers, commercial airlines, aircraft leasing companies, air cargo carriers and governments. IAC’s core business involves aircraft painting, aviation technical services, aircraft interior refurbishment and aircraft graphic solutions.

“Aim to open new facilities”

“We are excited to partner with Tiger for IAC’s next chapter of growth,” said Martin O’Connell, CEO of IAC.  “We expect a combination of aviation industry tailwinds to drive demand growth for aircraft painting, and in partnership with Tiger, we aim to open new facilities and expand our capacity substantially in the years to come.  By 2027, we anticipate the industry will have a significant shortfall in serving capacity versus annual demand.” 

New podcast episode: The last year in review

In the latest episode of the European Coatings Podcast, we speak about how the past year has been for the paints and coatings industry and the results of our annual survey.

2021 has already been the second year in the Covid-19 pandemic. Despite these adverse circumstances, the year has been relatively good for the coatings industry, as our traditional annual survey with industry decision-makers in the European Coatings Journal shows.

However, high prices and shortages of key raw materials are worse than ever. Our editors Damir Gagro and Vanessa Bauersachs talk about the shortage of raw materials and other results of our annual survey in our latest podcast episode.

——————

Speaking:  Damir Gagro, Vanessa Bauersachs / Production: Sarina Lux

—————–

This podcast is available on Apple Podcast, Spotify, Soundcloud and many other players of your choice. All recent episodes can be found on our overview page.

Remark: This podcast is sponsored by MÜNZING.

Keyword: HE 5000

Smart epoxy coating for corrosion protection

A new study decribes a smart epoxy coating with mesoporous silica nanoparticles loaded with calcium phosphate for corrosion protection.

During the study, calcium phosphate was encapsulated into mesoporous silica nanoparticles (MSN). The effect of pH on the structure and morphology of the MSN and the release of calcium phosphate from the MSN was investigated. Epoxy coatings with encapsulated (3 wt%) and non-encapsulated (3 wt% and 5 wt%) calcium phosphate were formulated and their anti-corrosive performance was evaluated.

Anti-corrosive performance

Results showed that encapsulation of the calcium phosphate as inhibitive pigment in the coating can enhance the anti-corrosive performance by preventing spontaneous pigment dissolution and controlling the pigment’s release from the coating.

The study has been published in Progress in Organic Coatings, Volume 165, April 2022.

Keyword: 25M 4P For TNS

Product Development Planning, from Product Idea to Manufacture

Time to read: 6 min

In an engineering utopia, every project would come in on time and under budget—and, of course, be delivered by a unicorn. Two of these are possible, despite all three being rare. But few projects are planned well, so we end up with unrealistic expectations and often don’t figure that out until the project is 80% through the original timeline and nowhere near 80% complete. How can you solve this perennial dilemma and introduce more predictability into your design process?

The solution is a phased program plan. Surprisingly, even though every product is unique, the process for developing an idea into a market-ready product always follows a similar pattern, and following a standard project plan increases predictability in product development. Breaking down complex projects into smaller phases, like breaking down a cross-country road trip into shorter legs, you can more easily predict the time and cost for your projects, arriving at your destination—project launch—with a smile.

Phased Project Plan Overview

Two of the biggest reasons projects break budgets are: a) Estimating time and cost for a large project is too complex to handle as a single piece; and b) it’s tempting to jump around, completing parts of the detailed design before a spec is complete, or adding features after the product is already mostly complete. A phased program plan solves both of these problems.

First, by following along the same steps for every development project—and tracking the time required for each phase—the task of estimating budget for these small phases becomes much simpler (though, sadly, never simple). Second, once each phase is completed, that part of the project is done; if you do decide to revisit past project phases, both you and your managers know you’ll need to adjust the budget and timeline to accommodate the addition.

With all this magic, how do you implement a phased product plan for your product? The beginning is very simple: Start with a product manifesto.

Problem Definition or Product Manifesto

Before you can start planning your project—before you even commit to a project, and certainly before you can begin developing it—you need to take the time to answer one question: What is its purpose?

For simple products, this can be a really simple answer. If you’re designing airplanes, this answer will be more multi-faceted. For any product, this is the starting point. You’ll get into highly technical specifications at the beginning of the actual development work, but for now you need to develop a high-level overview of what problem the product is going to solve and how it’s different than the competition. Make this as clear and concise as possible—you want this to be your guiding light for both planning the project and developing the product.

Specification Development

Now that you know where your project is going, you can begin the planning in earnest, and the first phase to plan is the specification development. This is often a phase where it’s easy to skimp, but investing the time up front to create a really good specification document will make every phases afterward smoother, so it’s well worth budgeting enough time to create a really good document with all the necessary research.

What makes a good specification? Pass-fail requirements. Writing a specification is largely a matter of taking soft, fuzzy desired features and translating those into hardline technical requirements. “Lightweight” is a useless requirement; “under three pounds” is a requirement to which you can design.

How long will you need to plan on this phase taking? That depends on the product, but for complex products, this phase can take hundreds of man hours. Plan to research standards for different requirements and possibly to do testing or in-depth research as part of the specification development. These requirements will become your testing standard in later phases, so budget enough time to get this phase right.

Concept Development

Concept development is the fun phase; it’s what many of us had in mind when we became engineers, and it’s the part Hollywood shows as a quick-moving montage of whiteboard sketches and high fives. For each concept area, plan to follow the same basic steps of brainstorming designs and comparing the designs to your specification for selection, but keep in mind that this phase can also have miniature development cycles entirely encompassed in the design, so you may also be creating mockups of different concepts to test out key features.

Detailed Design

Detailed design takes the concept (or concepts) you’ve developed and creates designs ready for prototyping and testing. The bulk of the development time will be spent in this phase, and as the detailed design is being developed, you may also be doing some small tests to validate parts of the design.

This is also the part of development where you’ll be handling fine-grain refinement, selection of off the shelf parts, and making your design easy to manufacture—everything to have the concepts ready for production. With such a massive scope, this is the part of the project that typically gets underestimated, so be sure to have some in-depth conversations with experienced members of your team when planning time and budget for this phase.

Iterative Refinement

Great designs require multiple rounds of testing and refinement, and you’ll need to build that time into your plan from the start. With more details in our article on testing, keep in mind that even for simple products you should plan on three to four iterations of “prototype-test-refine” for the complete design, before everything feels right and functions well.

Preparing the Product for Manufacture

And once your product is functioning well, it’s worth reviewing the design again to ensure that it will transition to mass production easily. Just keep in mind that even though you’ll need to do this final review of the design before moving forward to production, design for manufacture (DFM) and design for assembly (DFA) should be elements of the design, even from the concept development stage. If you have a good team of experienced designers and engineers and kept this as a polestar during the entire design phase, then you won’t need to plan too much time for this part of development, but if your team is less experienced, be sure to budget in enough time for further changes at this stage.

Getting Manufacturing Quotes

Putting together a request for quote (RFQ) feels wonderfully final the first time you do it, and nearly insignificant every time afterward. The manufacturing team receiving your RFQ will almost certainly have more experience in their field than your team, so be sure to allow time for feedback on the manufacturability, and plan on making some changes before the design is completely final.

Transitioning to Production

Once your product is at the manufacturer, it’s going to be time for some celebration. Budget time for your team to take the vacations they’ve been putting on hold, to catch up on sleep, to relax a little—and then plan on getting the team back to work. Managing a product during its production phase has an entirely different set of challenges, and you can look forward to an upcoming article for more information on that (sign up here to get the update as soon as it comes out).

Estimating Time and Resources

Now that we’ve mentally traveled through the whole development process, it’s time to return to the beginning: the project plan. How do you know how much time and money to allocate to each phase?

Unfortunately, there is no easy answer, and the best solution is to rely on the experience of your team. Break down the process in your project plan in as much detail as you can, and then speak with each team member to get estimates for each tiny chunk of work.

However, don’t take their estimates at face value when you’re adding up hours required for the project; it helps to compare their past predictions to actual work time to see how you’ll need to adjust their estimates. Does Tom always promise things in two days but give them to you in three? Plan on 50% extra time added on his estimates. Does Susan always deliver a couple days ahead of schedule? Adjust accordingly.

Finally, give yourself a small amount of margin in each phase, just in case you get a little behind. If you don’t need it in that phase, great! You have it for a future phase, and your clients are thrilled. How much should you allow? Again, that’s going to be based on experience with your team, but I usually add in about 15-20% when I’m working alone, and I’ve yet to receive complaints that I’m too early.

Planning Your Project

Maybe we can’t have unicorn delivery, but by planning your project to closely follow the steps above, you can achieve that mystical on-time, under-budget project. Are you just beginning your product development journey? Sign up here to have great design tips and technical articles delivered right to your inbox. Or are you scrambling to finish out a project that’s short on time? Check out our next-day prototyping services to help you get back on track!

生產管理系統架構的最佳解決方案:提升效率與降低成本的實用指南

摘要

本文探討了如何通過最佳化生產管理系統架構來提升企業效率與降低成本,這對於每一位想要優化運營的決策者來說至關重要。 歸納要點:

  • 微服務架構提升靈活性:透過將生產管理系統拆解為獨立的微服務,能夠更快速地進行迭代開發與資源調整。
  • 混合雲部署實現成本效益:結合公有雲的彈性和私有雲的安全性,滿足企業對數據保護和運算需求的雙重考量。
  • 數據湖與人工智能分析瓶頸:利用數據湖收集大量生產數據,並結合機器學習技術,提高流程效率及資源利用率。

整體而言,採用先進技術和策略可顯著提升生產管理系統的效能與經濟效益。

生產管理系統架構的關鍵要素:打造高效運營的基石

在現代生產管理系統架構中,有幾個關鍵要素能夠成為提升效率與降低成本的基石。人工智慧驅動的預測性維護正逐漸成為主流。這意味著我們可以透過收集裝置運作資料,像是溫度和振動,來預測何時可能發生故障。想像一下,如果系統能提前警告工程師進行維護,那麼停機時間就會大幅減少!接下來,雲端平台的彈性擴充套件也至關重要,它讓生產管理系統隨著需求變化而調整資源配置,避免不必要的硬體投資。而虛實整合技術,例如數位孿生,可以模擬整個生產流程,在虛擬環境中最佳化方案,降低實際操作中的風險。這些技術不僅提升了產品品質,也讓企業在激烈競爭中佔得先機。
本文歸納全篇注意事項與風險如下,完整文章請往下觀看

  • 須注意事項 :
    • 生產管理系統架構的複雜性可能導致員工培訓需求增加,若未能妥善安排培訓計劃,易造成使用者操作不當及效率低下。
    • 在轉型至雲端或邊緣運算時,數據安全及隱私問題亟待解決。若缺乏有效的安全措施,企業將面臨潛在的資料洩漏風險。
    • 過度依賴人工智慧進行決策可能導致對人類判斷的忽視。一旦AI模型出現偏誤或無法處理特殊情況,企業運營將受到影響。
  • 大環境可能影響:
    • 市場上快速變化的科技環境要求生產管理系統必須不斷更新,以適應新的工具和方法。若無法迅速跟上趨勢,則面臨被競爭對手超越的危機。
    • 全球供應鏈的不穩定性,例如疫情或地緣政治因素會影響生產管理系統的效能與可靠性,使得企業難以保持穩定運作。
    • 隨著技術進步和開源解決方案增多,小型創新公司進入市場,加劇了大型企業製造業務模式的競爭壓力,使其傳統優勢受到挑戰。

從雲端到邊緣:探討不同生產管理系統架構的優劣

在當前的生產管理中,雲端混合邊緣架構正迅速崛起。這種架構結合了雲端的彈性和邊緣裝置的低延遲,讓製造業能更靈活地應對需求。例如,我們可以把資料收集和初步分析放在現場裝置上,而更複雜的資料處理則交給雲端來做。這樣可大幅降低通訊延遲,提高即時決策能力。

人工智慧(AI)和機器學習也在生產管理中發揮著重要作用,它們幫助我們分析大量資料,以最佳化流程、預測故障並降低成本。想像一下,AI系統可以根據裝置執行狀況預測何時需要維修,避免不必要的停機損失。

在享受這些技術帶來便利的同時,我們也必須重視安全性與資料隱私問題。畢竟,雲端系統容易遭到攻擊,而邊緣裝置有可能缺乏足夠保護。因此,加密技術、多因素驗證及嚴格訪問控制是我們不可或缺的防線。我們不能忽視這些挑戰!

我們在研究許多文章後,彙整重點如下

網路文章觀點與我們總結

  • 優化生產管理系統架構有助於提升生產效率和降低成本。
  • 系統組成需涵蓋計劃、排程、人力與資源預估等要素。
  • 資訊整合能促進各部門協作,提升運營效率。
  • 可擴充性確保系統能隨著業務需求變化而調整。
  • 即時數據分析和監控可以快速滿足市場需求。
  • 直觀的使用界面減少學習曲線,提高操作效率.

在當前競爭激烈的製造業中,生產管理系統扮演著不可或缺的角色。不僅能有效安排資源以提升效率,還能透過數位工具讓各部門之間更好地協作。隨著市場需求日益多元,企業必須靈活應對,而一個優化且友好的生產管理系統正是成功的關鍵所在。

觀點延伸比較:

系統組成 計劃與排程 人力與資源預估 資訊整合 可擴充性 即時數據分析 傳統系統 通常依賴手動調整,效率較低 人力資源需求難以精確預估,導致浪費 部門之間溝通不暢,協作困難 擴展成本高,需重構系統架構 數據更新延遲,不符合市場需求 現代化解決方案 使用自動化工具進行實時調整,提高反應速度 智能算法幫助準確預測人力與資源需求 API和平台集成促進跨部門協作 模塊化設計便於快速適應業務變化 即時儀表板顯示最新市場趨勢 未來趨勢 智能製造將推動計劃與排程的高度自動化 AI技術可優化人力配置及資源利用率 雲端運算提升資料共享速度和安全性 彈性架構支持業務模式轉型 機器學習加速數據洞察並引導決策

數據驅動決策:如何利用生產管理系統架構優化流程與降低成本

在當今生產管理中,資料驅動的決策至關重要。讓我們來看看如何利用生產管理系統架構最佳化流程與降低成本。

1. **預測性分析與機器學習:** 透過收集歷史資料並運用機器學習,我們可以建立精準的預測模型。例如,透過分析裝置維護的資料,可以預測何時會發生故障,提前安排維護,避免生產線停擺

Keyword: 裝潢